Advanced

View Link History


Step 1:

Begin by installing the Appvibe Asana Integration app from the Jira Marketplace. Ensure the app is properly configured to establish a link between Jira and Asana.

Step 2:

Once installed, every modification made to an Asana link within a Jira issue is automatically tracked. This includes any changes or updates to the links.


Step 1:

Access the modification history directly from within your Jira issue. This makes it easy to review all changes made to an Asana link over time.

Step 2:

The history is stored either at the link level or the Jira issue level, giving you flexibility in how you retrieve and view past modifications.


Step 1:

To view the history, navigate to the relevant Jira issue that contains the Asana link. Locate the section where the history is made accessible.

Step 2:

The modification history can be viewed at any time, ensuring you have a comprehensive log of all changes made to the Asana link in the context of Jira.

Link Permissions

Step 1:

Go to the Appvibe Asana Integration configuration page, or click 'permission' from within the link settings in a Jira issue.

Step 2:

Select the desired permissions (Viewer, Editer, Admin) for each user to control access to the links in a given issue.